Tent Permit Applications

PERMIT FEE, CHICAGO TENT

Where to find PERMIT FEE, CHICAGO TENT in Chicago

Image for reference only
Actual item may look different
Click on image for larger view

Monthly: Call For Quote

Instructions: <Click Here>

Quantity: for a period of  


Additional Information

  • ANY TENT OVER 400sqft REQUIRES A PERMIT
  • THERE MAY BE ADDITIONAL CHARGES ADDED IF: SPECIAL DRAWINGS OR PLOT PLANS ARE REQUIRED. ADDITIONAL INSURED CLAUSES ARE REQUIRED
  • ON SITE INSPECTIONS ARE REQUIRED WITH FIRE MARSHALL
  • ARCHITECTURAL DRAWINGS ARE REQUIRED
  • LATE NOTICE & PERMIT EXPEDITING SERVICES FOR LAST MINUTE EVENT
  • ______
  • Note 1: The City of Chicago requires all platform/stages over 24" tall and any tent/canopy/marquees over 400 sq.ft. to be permitted. Each Site must be permitted separately. The City requires 2 weeks review time.
  • Note 2: The City of Chicago requires the Architect to Self-Certify the Architectural Drawings and perform an Inspection for all tent/platform/stages over 4000 sf, or less than 2 week city review time frame.
  • Architectural Tent/Platform/Stage Fees:
  • One Tent/Platform/Stage (over 24") with Site Plan.
  • Additional Different Size Tent/Platform/Stage on same site.
  • Additional Furniture/Seating Plan (within tent) .
  • Additional Same Size Tent/Platform/Stage on same site.
  • Reinstatement of Previous Event (resubmitting permitted drawings).
  • Administrative Relief submittal (for tents closer than 20 to any building).
  • (Note: Admin. Relief requires 1 extra week time frame)
  • The Above Fees Include:
  • 1) Signed/Sealed Drawings (PDF s)
  • 2) Signed/Sealed Wind Calculation Sheets
  • 3) Normal Delivery 3 weeks from receiving Worksheet (1 week drawing + 2 weeks City Review)
  • Additional Architectural Tent/Platform Fees:
  • Rush Fee = Less than 3 weeks to Set-up date (from receiving Worksheet).
  • Self Certification & Field Inspection (All Tents/Platforms/Stages over 4000 sf or less than 3 week time frame) up to 3 tents/platforms/stages.
  • More than 3 tents/platforms/stages per event .additional $
  • (Includes Self-Certification & Signed/Sealed Certification of Inspection Letter)
  • Permit Submittal Fees:
  • City of Chicago Permit Submittal New or Reinstatement.
  • Unincorporated Cook County Permit Submittals Varies per project
  • Notes: 1) Any Large tents (4,000 sf or above) will be charged an extra $
  • 2) Clearspan/Structure tents 4,000 sf or above require a Structural Peer Review.
  • 3) City of Chicago also requires Engineering Calcs for all Clearspan/Structure Tents.
  • MUNICIPAL REQUIREMENTS FOR TENTED EVENTS.
  • SIZE REQUIREMENTS:
  • REQUIRED PERMIT FOR ALL SIZE TENTS
  • FIRE EQUIPMENT REQUIRED FOR THE TENT:
  • PERMIT POSTED ON TENT
  • INFO. REQUIRED FOR PERMIT:
  • PLAT OF SURVEY - GOGGLE / FLAME RETARDANT CERT.
  • OUR COST: $__ PER TENT - NOTE: ADD $__ FOR EACH ADDITIONAL TENT.